Wednesday, December 11, 2013

These are conceptual drawings that were presented at the two public input sessions on December 10, 2013. Comments from these two meetings will be posted soon. We welcome all comments throughout the next few months as we revise and finalize the plans. The next public input session is scheduled for January 14, 2014 from 5-6 PM in the lobby at City Hall.

Conceptual Drawing of the Bike Park at Lake Atalanta 

 Conceptional Drawing of the Hydraulic Dredging &  Boardwalk Construction


Conceptional Drawing of the Dam & Walnut Grove Improvements


Conceptual Drawing of the Overall Concept of Lake Atalanta Park

Conceptual Drawing of Lake Atalanta Park and the Amenities

Conceptual Drawing of the Pedestrian & Vehicular Circulation


Conceptual Drawing of the Pedestrian & vehicular Circulation