Ecological Assessment of Lake Atalanta
The City of Rogers has received the Ecological Assessment of Lake Atalanta from FTN Associates, Ltd.
It can be accessed here:
It can be accessed here:
Thursday, February 6, 2014
Tuesday, January 7, 2014
A Public Input Session has been scheduled for January 14, 2014 at 5 PM
The next public input session has been scheduled for January 14, 2014 at 5pm in the lobby of City Hall. We hope to see you there!
Monday, January 6, 2014
Monday, December 23, 2013
Public Forum Responses Scheduled for Release on January 21st
To prevent multiple duplications, our responses to the comments from the 3 open forums will be released after the January 14th Public Meeting. Please check back here on January 21st!
Thursday, December 12, 2013
THANK YOU for your input on these concepts. These suggestions will be reviewed by the committee at the next meeting.
Lake Atalanta Public Meeting Notes- Noon & 5 PM Sessions
Bike Park:
- Add a concrete skate park
- Try to avoid pre-cast concrete, use
pour-in-place
- Skate bowls
- Variety of street and transition elements
- Lights
- Native plants
- Erosion control
- Impact study for trails
- Reduce mileage of trails
- Separate walking from biking trails
- Concerned about multi-use. Hikers should have
some trails that are for hiking only and other trails for bikers. There are
enough biking trails
Park &
Amenities:
- Shallow swimming area in the lake for kids
(3-4 feet deep)
- First aid/bike repair/fishing supply shop
- Scout Hutch as an event and meeting space
(utilities for a crowd)
- Benches
- Accessibly for wheelchairs/disabled
- Historical site signage (historical past,
buildings)
- Nature signs (types of trees)
- No place that can’t be seen from a central
location for safety
- Plenty of trash cans
- Rollerblading allowed
- Designated areas at dog park
(big/little/courses)
- Dirt bike race track
- Natural style/colored playground equipment
- Emergency call boxes
- Community gardens
- Park/trail maintenance
- Archery range at back end of property
- Observation tower (limit field of vision of
tower to the house to the west)
- Native plants
- Gazebo over Diamond Springs
- Mile markers
- Water learning center – water treatment &
Scout Hutch, history with water, education center
- Trails welcoming to hikers
- Trails in sensitive plant, animal, and geology
areas
- Hummingbird festival
- Signage – interpretative of flora and fauna
- Add exhibition/events area in green space area
- Compartmentalize segments of the trail for
various user groups.
- Bat & owl houses
- Keep trails off of slopes along Frisco and
Prairie Creeks due to nesting bird and erosion
- Reposition bike trail on East side (to West of
road)
- Light trail from Cherry to Clark Pavilion
- Security/ranger station
Dredging
& Boardwalk:
- Boardwalk across Elder Cove and/or walk down
fishing dock
- Bridge across lake from side to side so people
do not have to walk the whole lake
- Add subsurface habitat to existing lake
- Walkway crossing lake
- Fishing bump-outs along boardwalk to prevent
traffic problems
- Phosphorus mitigation
- Concerned about dredging sediments being left
in piles on Elders property
Dam &
Walnut Grove:
-Water impoundment would degrade the creek
- RV parking north of dam
- Minimize ponding on steams
- Keep the creek flowing as it is now
- Stock lake with native fish (no trout)
Pedestrian
& Vehicular Circulation:
- Pave road around lake.
- Highway 12 improved access
- Parking along the road (pull offs)
- Add tree islands in parking areas
- Make road around lake pedestrian only
- Remove the road around lake
- Speed tables/breaks
- Gate road access
- Should not be a bike dominated park
- Eliminate the road – make it a hiking road,
not an area to congregate
- If nature center needs to be accessible by
vehicle, allow from dam parking lot to nature center. Prohibit vehicle traffic
between nature center and Timber Ridge for a natural experience
Walnut
Street Improvements:
- Lighted, safe pedestrian trail from downtown
to lake for access.
- Restaurant/coffee shop to draw people
- Access to East Walnut (East of park)
- Stroller access to downtown
- Keep fireplace in pavilion
- Keep green space on Southside
- Remove invasive/exotic vegetation (Kudu,
Japanese Honeysuckle, and Privet)
- No trout pond on South side
Additional
Comments:
- Coordinate planning between Gateway downtown
plan and Lake Atalanta
- Extend public input period 30-45 days
- Lake Atalanta advisory board should include a more
diverse group of citizens
- Concerned about ensuring environment is
considered in all designs
- Medians are hard and expensive to maintain
- Send the power company a letter to stop them
from spreading herbicides under the power lines.
- Concerned about invasive construction into
hillside
- Concrete advised for Skate Park
- Free Wi-Fi
- Maintain restriction of “no amplified sound”
Wednesday, December 11, 2013
These are conceptual drawings that were presented at the two public input sessions on December 10, 2013. Comments from these two meetings will be posted soon. We welcome all comments throughout the next few months as we revise and finalize the plans. The next public input session is scheduled for January 14, 2014 from 5-6 PM in the lobby at City Hall.
Conceptual Drawing of the Bike Park at Lake Atalanta |
Conceptional Drawing of the Hydraulic Dredging & Boardwalk Construction |
Conceptional Drawing of the Dam & Walnut Grove Improvements |
Conceptual Drawing of Lake Atalanta Park and the Amenities |
Conceptual Drawing of the Pedestrian & Vehicular Circulation |
Conceptual Drawing of the Pedestrian & vehicular Circulation |
Wednesday, December 4, 2013
Subscribe to:
Posts (Atom)